text
Electricity Authority AHK Headquarters, Nicosia, 1995
competition entry
In this master plan for the Electricity Authority central offices the project was divided into 2 phases, the design of phase 1 was to visually appear complete even though phase 2 was not constructed. The two linear office buildings were connected with the oval tower that would accommodate all common areas of phase one and the future phase 2 building. All recoverable and renewable energy made in the voids was given back to the building while at the same time the south facing facade and roofs harvested electricity with photovoltaics.
competition entry
In this master plan for the Electricity Authority central offices the project was divided into 2 phases, the design of phase 1 was to visually appear complete even though phase 2 was not constructed. The two linear office buildings were connected with the oval tower that would accommodate all common areas of phase one and the future phase 2 building. All recoverable and renewable energy made in the voids was given back to the building while at the same time the south facing facade and roofs harvested electricity with photovoltaics.